The general practice of MTOC was to establish the Car Depots at the termini of various lines. The only exception to this procedure was the Toorak Depot, which was situated at the corner of Toorak Road and Chapel Street at the rear of the Toorak engine house, and at a distance of approximately 1¼ to 1½ miles from the Toorak terminus [4].
From a traffic viewpoint, the depot at the terminus gave the Line Manager, who had complete control of the service running from his depot, the opportunity to readily reorganise the service in case of delays or accidents, by running in or out cars to make adjustments to the timetables. A disorganised service was quickly re-established by the Line Manager who was a thoroughly competent traffic officer with authority to act in this capacity.
Gripmen and conductors in front of Richmond Car Depot at the eastern
end of Bridge Road, circa 1885. The facade of this building still
exists as the street frontage for a hotel. Note the conductor standing
in front of the first window pillar of the trailer car the
two strips of cardboard used in conjunction with the bell-punch to
tally fares are visible pinned to the lapels of his uniform coat.
The Car Depots had frontages to the roads on which the tramway service operated at fourteen of the sixteen depots. The fourteen depots referred to had run-outs and run-ins provided which were of minimum length. This was advantageous because cars and dummies were manhandled in and out of depots in most cases. Horses were used at four depots for this purpose, two of which had run-outs to very wide roads, the other two were in one case a heavy car (bogie) and in the other a comparatively long run-out on a gradient.
The majority of Depots had a run-out track to the up line [5] and run-in from the down. This was particularly advantageous for the man handling of rolling stock, when the run out or up track was on a downgrade and consequently the running from the other track was also on a downgrade.
Other layouts were level which were reasonably convenient for the man-handling of trams at these depots. In a very small minority of cases a single run-in and out track was provided. The following table sets out the sixteen depots, where situated, their capacity, and rolling stock housed at each in 1923, at which time the whole cable system was operating at its maximum capacity [6].
| Depot | Location | Maximum Capacity (dummies) | Maximum Capacity (trailers) | Operating Capacity (dummies) | Operating Capacity (trailers) | Comments |
|---|---|---|---|---|---|---|
| Brunswick | Sydney Rd & Cozens St | 70 | 70 | 64 | 66 | Bogie trailer cars 24' saloons |
| North Carlton | Rathdowne & Park Sts | 34 | 34 | 33 | 35 | |
| Nicholson St | East side of Nicholson St, near Liverpool St | 38 | 38 | 25 | 25 | |
| Fitzroy | St Georges Rd & Holden St | 44 | 44 | 33 | 33 | |
| Clifton Hill | West side of Queens Pde, near Brennan St | 51 | 51 | 45 | 43 | |
| Carlton | Johnston St & Trennery Crescent | 34 | 34 | 31 | 31 | |
| Victoria St | South side of Victoria St, near Victoria Bridge | 50 | 50 | 47 | 46 | |
| Richmond | Bridge Rd & River St | 52 | 52 | 38 | 33 | |
| Toorak | Toorak Rd & Chapel St | 21 | 21 | 22 | 21 | 1 dummy standing on traverser |
| Prahran | Chapel & Carlisle Sts | 43 | 43 | 31 | 31 | |
| Brighton Rd | Brighton Rd & Brunning St | 42 | 42 | 42 | 42 | |
| St Kilda Esplanade | West side Acland St, near Barkly St | 50 | 50 | 47 | 50 | |
| South Melbourne | Victoria Ave & Beaconsfield Pde | 41 | 41 | 36 | 37 | |
| Port Melbourne | Beach & Donaldson Sts | 21 | 21 | 17 | 17 | |
| North Melbourne | South side of Flemington Rd, near Flemington Bridge | 43 | 43 | 34 | 33 | |
| Northcote | High & Martin Sts | 15 | 15 | 15 | 15 | |
|
Total
|
560 | 558 | ||||
|
Spare Cars
|
25 | 20 | ||||
|
Cars at workshops
|
12 | 23 | ||||
|
Total rolling stock
|
597 | 601 | ||||
All car depots were built to the same basic design. A brick dwarf wall on concrete foundations carried a timber bottom wall plate, on which wooden pillars were mounted supporting the timber top wall plate and roof principals. Intermediate studs and lateral timbers were positioned where required for windows and other openings. The walls were braced with the customary diagonal bracings, and further timber pillars were erected on concrete foundations throughout the depot, in the position required to carry the timber roof principles with purlins lines, skylight frames etc.
The walls and roof coverings were of 16 gauge corrugated galvanized iron, and the timber used in the building construction was oregon. Heavy timber sliding doors were installed to close the main entrance where tracks were laid for the running in and out of trams. Small doors in the large sliding doors were used for access outside normal operating hours. Natural lighting was provided by skylights and windows.
With the addition of gas lighting, roof guttering, down pipes, drainage and water supply, the depot was ready for the installation of tracks, traverses, pits, turntable, and other facilities necessary for operation.
The layout of the typical car depot is shown at Figure 1.
Figure 1. Typical layout of car depot. Each depot was supervised by a Line Manager with responsibility for operating the depot and associated routes. Traffic clerks, gripmen and conductors were under his control, but the shed leading hand and mechanics (known collectively as the shed staff) were accountable to the Workshops Superintendent for the maintenance of all the rolling stock and car depot equipment & plant.
The leading hand was issued with a copy of the timetable so that trams could be made ready for service as required. The shed staff, assisted by the grooming conductors, attended to the running in and out of trams and the lowering or lifting of grips.
The turntable was employed to reverse the dummy when necessary so that it went into service with the grip dies opening in the correct direction. Unlike some other cable tram systems, the Melbourne system used a side opening grip that was not symmetrical on the center line of the cable slot. This meant that the grip opening had to be oriented in the correct direction for normal operation.
As a result of this design feature, there were limitations on what routes could be through-routed to other routes based on the direction of the grip dies opening. As a result through routing of trams between Bourke, Collins and Flinders Streets via Spencer Street was not possible, although this was often put forward by members of the public as a method of reducing city congestion caused by shunting.
| Route | Direction of grip opening | |||
|---|---|---|---|---|
| North | South | East | West | |
| Nicholson St | Bourke St | Nicholson & Evelyn Sts | ||
| Fitzroy | Collins St | Brunswick & Gisborne Sts, & St Georges Rd | ||
| Clifton Hill | Gertrude & Bourke Sts | Plenty & Heidelberg Rds, Smith& Evelyn Sts | ||
| Northcote | High St | |||
| Carlton | Johnston, Elgin & Lonsdale Sts | Lygon, Russell & Swanston Sts | ||
| Victoria St | Collins & Victoria Sts, Victoria Pde | Gisborne St | ||
| Richmond | Bridge & Wellington Rds, & Flinders St | Spencer St | ||
| Toorak | Toorak & Domain Rds | Swanston & Park Sts, & St Kilda Rd | ||
| Prahran | Toorak & Domain Rds | Swanston, Chapel & Park Sts, & St Kilda Rd | ||
| Brighton Road | Brighton & St Kilda Rds, High & Swanston Sts | |||
| Esplanade St Kilda | Fitzroy St | Acland & Swanton Sts, St Kilda Rd & Esplanade | ||
| Windsor | Fitzroy & Wellington Sts | Acland St & Esplanade | ||
| South Melbourne | Bridport, Park & Collins Sts | Montague, Clarendon, Moray & Market Sts, Victoria Ave & City Rd | ||
| Port Melbourne | Beach & Collins Sts | Bay, Moray, Market & Gisborne Sts, & City Rd | ||
| North Melbourne | Queensberry & Victoria Sts, & Flemington Rd | Abbotsford, Errol & Elizabeth Sts | ||
| West Melbourne | Lonsdale St | Abbotsford, Errol & Elizabeth Sts | ||
| Brunswick | Sydney Rd & Elizabeth St | |||
| North Carlton | Elgin & Lonsdale Sts | Rathdowne, Lygon, Russell & Swanston Sts | ||
Another example of this is that North Carlton trams could not be through-routed to West Melbourne, despite both routes operating on Lonsdale St on their respective sides of Swanston St.
In the early 1920s, the M&MTB constructed double cable tracks in Lonsdale St between Swanston & Elizabeth Sts, in order to through route Brighton Rd and North Melbourne trams. This reduced city shunting of trams at both Queensberry St (Brighton Rd trams) and Flinders St (North Melbourne trams). It will be seen from the above table that this was possible due to the facing of the grip openings for both these routes. However, this through-routing was short-lived, due to the early conversion of Swanston St trams to electric traction.
Trams were also turned periodically to allow both sides to be weathered equally. All trams passed over the examination pit prior to entering service, where a member of the shed staff inspected the undergear and sounded each wheel with a hammer for crack detection.
The shed staff normally moved the trams within the depot building by manhandling them between actions for the purposes of cleaning and maintenance. Traverser tables were used to transfer rolling stock from one depot track to another. It was suggested once to equip the traverser tables with ball bearings in order to reduce manhandling effort, so one of them was modified appropriately. However the experiment was unsuccessful due to the difficulty of stopping it at the required position. It was also too lively when a car was being pushed off the traverser table, as it would tend to roll away from the stationary position, resulting in a minor derailment. This could have been overcome by provision of a locking mechanism, but this would have taken extra time during busy periods.
The only depot where traverser tables were fitted with a locking mechanism was Brunswick, where horses were used inside the depot for the movement of bogie trailers, due to their greater weight. The locking mechanism was required to stop sideways movement of the table as a result of an indirect pull by the horses when moving the cars.
In order to accommodate the bogie trailers at Brunswick, the traverser tables were longer than standard at 22 feet long, and were supported by three pairs of wheels on three rails on the traverser track rather than the standard two at all other depots. Horses were also used to move the traverser tables at Brunswick, which required them to step up and down heights of about 12 inches around the traverser track. This task was carried out at all other depots by manpower.
Fordson tractors were later used to tow cars in and out of depots except at Brunswick, which retained horses to the end, due to the need to use them to operate the large traverser tables.
All body work on bogie trailers was carried out at Brunswick depot, so a paint shop was provided for repainting them. The bogies were transported to the workshops by horse-drawn lorry, but the dummies were run to the workshops for maintenance as for all other depots.
Another unusual feature at Brunswick depot was the provision of a run-out track with a slot and tunnel for the grip. This enabled the grip for one dummy to be lowered into position while it was standing over the inspection pit at the same time as another dummy was being equipped outside the track. This procedure was necessary to cope with the running in and out of trams for the heavy traffic on the Brunswick line, which called for 30 to 45 second headways at peak hour loadings.
The maintenance car depots and plant was entirely carried out by the workshop staff under the direction of the Workshops Superintendent. The necessary staff to handle all building repairs were employed at the workshops, including plumbers, carpenters and painters. If work in the nature of new buildings or bricklaying became necessary, tenders were called for the work to be done.
The traversers and turntables together with any tools or equipment were kept in good condition by the Workshops. The standard nature of this equipment enabled the changeover of spare traverses or turntables (held at the Workshops) at short notice, except at Brunswick. At this depot long traverser tables were used due to the stabling of the bogie cable trailers, so there were two in normal use with an additional traverser table held as a spare.
The tracks in the depots, including the run-ins and run-outs, were maintained by the permanent way staff under the direction of the Engine House Superintendents.
[4] The Toorak terminus was at the corner of Toorak Road and Irving Road.
[5] Melbourne tramway usage is to refer to the line towards the city as the up line and the line away from the city as the down line, as per normal railway parlance. British practice was followed in that left hand track running was the standard for the system.
[6] This table excludes the car shed in Howard Street, North Melbourne, which was not built until 1924 (the year after the data in the table). The electrification of the route along Flemington Road in the mid-1920s isolated the Flemington Road car shed, requiring a new car shed in order to maintain operation of the North Melbourne and West Melbourne cable routes.